Wood plastic materials have high strength, which invisibly increases the difficulty of construction. Taking the construction of railings and floors as an example, this article provides a detailed introduction to the experience summarized by Meisen's professional installation team over the years of construction, for reference only.

1、 Key points of railing construction

1. Some railings can be installed on the ground;

2. During installation, attention should be paid to protecting the surface of the wood plastic material from scratches;

3. During installation, it is important to ensure both strength and aesthetics, while also paying attention to the position of screws;

For railings with curvature requirements, the angle of the tenon needs to be calculated;

5. When installing the handrails' flower plates, pay attention to the beauty, and try not to expose the screw holes;

6. When installing the hat, glue should be used;

7. For railings with curvature requirements, attention should be paid to symmetrical transitions;

When mortising, the characteristics of wood plastic thermal expansion and contraction should be considered, leaving room for expansion and contraction activities;

When installing columns and road surfaces, steel plates can be pre embedded in concrete, and the bottom steel plate of the column can be welded to the pre embedded steel plate or fastened with bolts;

When the total length of the railing is greater than 300 meters, consideration should be given to adding deformable transition columns; 11. The style of the railing, the specifications of the selected profiles, and the span of the railing should be closely matched.

2、 Key points of floor construction

Before floor construction, the load-bearing capacity should be calculated;

2. Some areas that need reinforcement can be reinforced with concrete connecting beams and steel reinforcement;

3. When using steel reinforcement, be careful not to damage the original concrete structure;

4. The spacing between the dragon bones should be accurately calculated;

5. The keel needs to be leveled;

6. The keel and the ground should be fastened with expansion screws;

7. Burying the keel in concrete has a better effect;

8. A drainage ditch groove needs to be reserved;

Considering the characteristics of wood plastic, such as thermal expansion and contraction, expansion joints should be left horizontally on the floor;

10. The floor and keel should be fastened with stainless steel screws;

11. Expansion joints should also be reserved in the longitudinal direction of the floor, and the size of the joints should be designed reasonably according to the temperature during use, the expansion coefficient of the material, and the length of the material;

12. The board should be fastened to the keel with two stainless steel screws;

13. Due to the slight thermal expansion and contraction characteristics of wood plastic profiles, and considering cleaning and other reasons, appropriate gaps must be left between edges and ends during installation of wood plastic profiles;

14. It is best to install the profiles on the keel when installing wood plastic flooring;

15.When there is an inclination angle between the profile and the keel, or when installed in a bathhouse, please reduce the spacing between the keels by at least 10 centimeters.


Mount Huangshan Meisen New Material Technology Co., Ltd    Anhui ICP No. 17004275    

Address: No.17, Hanlin Road, Economic Development Zone, Mount Huangshan, Anhui   

0559-2580001 Domestic Trade Sales Department

Fax: 86-559-2580912

 Anhui Public Security Registration No. 34100202000281


b

Message

Clientele Services

Map

Telephone